Describe control key utility & also standard key ? how many
fields can be configured for standard value key?

Answer Posted / prakash

1. Control key is basically used in Operations( Routing or Master recipe). With the use of control key u Choose Scheduling,capacities,cost,rework,Automatic GR should be considered for the Operation or not.

2. Standard value key: In Standard there will be 3 parameters defined and if we want to configure seperately we can configure a maximum of 6 parameteres for SVK.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Mention what is the t-code for changing production order and to display production order?

627


What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?

1703


What is qualification deficiency?

712


What is the purpose of using capacity planning?

572


Both labor and machine categories exist. How would you calculate the process time?

596






You want to create object dependencies in a bom for configurable materials? How would you navigate?

558


Integration between PP and SD module.

971


what does SAP business workflow do?

1617


Explain what is plm (product lifecycle management) in sap pp and what is the use?

641


Explain how ‘pp’ is ‘integrated’ with other modules?

608


What do we do in the realization phase?

529


Explain source inspection.

979


How can you get planned orders scheduled so that you can do capacity leveling ?

622


What is the data you give in S.O.P screen?

1977


Explain what is prt (production resource tools) in sap pp?

586