Describe control key utility & also standard key ? how many
fields can be configured for standard value key?
Answer Posted / prakash
1. Control key is basically used in Operations( Routing or Master recipe). With the use of control key u Choose Scheduling,capacities,cost,rework,Automatic GR should be considered for the Operation or not.
2. Standard value key: In Standard there will be 3 parameters defined and if we want to configure seperately we can configure a maximum of 6 parameteres for SVK.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Mention what is the t-code for changing production order and to display production order?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What is qualification deficiency?
What is the purpose of using capacity planning?
Both labor and machine categories exist. How would you calculate the process time?
You want to create object dependencies in a bom for configurable materials? How would you navigate?
Integration between PP and SD module.
what does SAP business workflow do?
Explain what is plm (product lifecycle management) in sap pp and what is the use?
Explain how ‘pp’ is ‘integrated’ with other modules?
What do we do in the realization phase?
Explain source inspection.
How can you get planned orders scheduled so that you can do capacity leveling ?
What is the data you give in S.O.P screen?
Explain what is prt (production resource tools) in sap pp?