how to calculate rate analysis of M25 grade concrete
Answer Posted / br rijal
Solution/ BR Rijal
Volume of dry concrete = 1.54 to 1.57 times volume of wet concrete
so,
calculation for 1 cu.m of concrete works:-
summation of ratio of concrete M25(1:1:2) = (1+1+2) = 4
Shrinkage Factor = 1.55 ( Assumed)
so,
Total volume of wet concrete required = 1.55 cu.m
Now,
Volume of cement required = (1/4)* 1.55 = 0.388 cu.m
= (0.388 / 1440) = 558 kg
cement required = (558 / 50) = 11.16 bags
volume of sand required = (1/4) * 1.55 = 0.388 cu.m
volume of Aggregate required = (2/4) * 1.55 = 0.775 cu.m
Therefore, For 1 cu.m of M25(1:1:2) concrete works;
cement required = 11.16 bags
sand required = 0.388 cu.m
Aggregate required = 0.775 cu.m
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
How much material will consume for following specification water tank (9*7.5*6 feet)?
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
What is the zero value in quantity surveying
Define Who designed the city of Washington DC?
what is the theoritical percentage of concrete cubes testing per day?
what is the composition of good brick ?
What is semirigid connections?
How to calculate woden area in sft and Cft
what is diversion?
Which is the direction of negative angle?
what is polity
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
how much of the strength comes from post-production curing
what is difference between GTS bench mark and temporary bench mark
why we are using stub column..? is it possible to construct steel stub column..?