how to calculate rate analysis of M25 grade concrete
Answer Posted / br rijal
Solution/ BR Rijal
Volume of dry concrete = 1.54 to 1.57 times volume of wet concrete
so,
calculation for 1 cu.m of concrete works:-
summation of ratio of concrete M25(1:1:2) = (1+1+2) = 4
Shrinkage Factor = 1.55 ( Assumed)
so,
Total volume of wet concrete required = 1.55 cu.m
Now,
Volume of cement required = (1/4)* 1.55 = 0.388 cu.m
= (0.388 / 1440) = 558 kg
cement required = (558 / 50) = 11.16 bags
volume of sand required = (1/4) * 1.55 = 0.388 cu.m
volume of Aggregate required = (2/4) * 1.55 = 0.775 cu.m
Therefore, For 1 cu.m of M25(1:1:2) concrete works;
cement required = 11.16 bags
sand required = 0.388 cu.m
Aggregate required = 0.775 cu.m
Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
The portion of a brick cut across the width is called?
What is the nature of duties & responsibilites senior civil engineer ?what is self confident & satisfaction should be a senior civil engineer?
What are the RISKS during the project construction?
What is the procedure of concealed plumbing in toilets?
What is the largest concrete dam in the world?
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
what is the percentage of silt in black cotton soil.?
how u design STAGING for Superstructure in BRIDGE construction?
how statics is different from dynamics
what are the changes in concrete pour height as per IS 456, 2009?
How many pyramid in egypt?
How to calculate volume of concrete & steel on tank foundation & ring wall ?
what is the theoritical percentage of concrete cubes testing per day?
Explain what are the problems one might face while having a Cantilever balcony?