How To Measure Honey Comb Full Brick Work, Can we deduct Hole, If Yes, how to Calculate Rate Analysis
Answer Posted / bulusu v s n murthy
Brick work per sq.m required bricks with wastage 54 nos (half brick wall) measurement for total area. No dediction of gaps .in honey comb b/ w nos required 44 nos per sample with wastage,now calculate rate per brick with nos add for scoffolding,highly skilled Mason,semi skilled Mason, in skilled workers as per our rata analysis in brick work only d quantam of work we get half of half d B/W quantity.supose 2 skilled+ 2 semi skilled+ 4un skilled can do 10 sq.m of half brick wall per day in case of honey comb it is 5sq.m.if u satisfy give feed back
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
What is meant by autocad?
to minimize budget cost of building , what can i do
What are the types of slump?
How foundation is designed, Column design and beam design
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
indian standard split spoon sampler
WHAT IS YOUR CURRENT SALARY
Material calculation of cm 1:6 for 1sqm
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
Used Cement & Sand in 1 Square Meter or 1 Square Feet For Brick Work 0.115mm ? (1:4) (1:6)
Which type of plywood & sizes using in construction projects ?
what is the formula to find the diagonal shape stirrups?