How To Measure Honey Comb Full Brick Work, Can we deduct Hole, If Yes, how to Calculate Rate Analysis
Answer Posted / bulusu v s n murthy
Brick work per sq.m required bricks with wastage 54 nos (half brick wall) measurement for total area. No dediction of gaps .in honey comb b/ w nos required 44 nos per sample with wastage,now calculate rate per brick with nos add for scoffolding,highly skilled Mason,semi skilled Mason, in skilled workers as per our rata analysis in brick work only d quantam of work we get half of half d B/W quantity.supose 2 skilled+ 2 semi skilled+ 4un skilled can do 10 sq.m of half brick wall per day in case of honey comb it is 5sq.m.if u satisfy give feed back
| Is This Answer Correct ? | 1 Yes | 2 No |
Post New Answer View All Answers
what are the duties of Site Engineer in work site?
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
define the strength
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
What is Rankine Cycle?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
What is the difference between the concrete mix design carried out by IS10262 and by ACI method ?
how to check and keep control on the wastage of material at site
Whats the standard thickness of 20'/30' wide rcc service road and what will be the estimated cost per cubit feet
how to calculate load bearing column
how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
Define What is a kip?
What is meant by a context menu in a cad software?