pcc is nothing but plain cement concrete .it can used for leveling the surface not for any load .
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
how to calcualate the amount of stone,cement,sand required for 1cum of 450mm thick ruble stond masonary with ratio1:5, please me an answer with dtailed step
How much does it cost for a R.C.C cover slab of size (450mmX 600mmx 100mm) double rf net given in feets using hand mix concrete?
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
How much does the leaning tower of pisa lean?
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
what is the tensile strength of 10swg and 8swg gabion wire?
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
What Are The Steps Involved In The Concreting Process, Explain?
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
What is the wall thickness of NP-3&NP-4 hume pipe as per I.S code
where will be the reinforcement of slab placed when there is an inverted beam and the bottom of the beam and slab are at same level ?