1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / arunava singha
brick size in meter=.23*.115*.075 =.0019
add 10 mm mortar for ech sides=(.24*.125*.085)=(.0025)
bricks required for 1 m3 =(1/(0.0025)=400 nos
mortar required =(.0025-.0019)*400=.24
add 15% for wastage = (.24*1.15)=.276m3
so required sand is =.276 m3
cement is =(1440/6)=240*.276= 66 kg
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Questions related to civil.engg in company
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
Tell me about triple point of water.
as per is code, what is the minimum content of opc and ppc cement for rcc structure
How to calculate carrying capacity of the existing water supply trunkmain
What ingredients with% found in ppc cement??
150mm bricks size how many use 4.14 m3
How is the leaning tower of pisa supported?
What is the difference between EPC,DBOOT and BOOT.
what is your role of in previous company as a construction manager
Explain major difference between auto level and dumpy level?
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
How to calculate canal slope curvature qty!
what is the price of a cubic meter of concrete on international market?