how many 1st class bricks in 1cu feet?
Answer Posted / ijaz
volume of brick= .75'x.25'x.375'
volume=.070cu ft
now in 100 cft = 100/0.070
=> 1428.57 nomber of bricks
now 10% mortar /////
deduction of mortorr= 10x1428.85/100 = 142.85
nomber of bricks
so net number of bricks = 1428.57-142.85= 1285.72
now for contengencies = 5%
so => 5x1285.72/100= 64.28
now the total number of bricks= 64.28+1285.72=1350.0061
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain soil analysis?
Doul Bar reinforcement and details of drawing.
How can i display 5 asterisk and another 5 asterisk )?
what post do you prefer to work in this company and why do you think you can serve better in such position?
What is min thickness,min grade of conc & age of PQC ?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
How do we test on design and style in a software?
sir when can we expect the AEE results and when will be the interviews sheduled please guide us in this regard thanking you
Who built the sears tower?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
What sizes of stones chips are used for foundation, column and floor casting. Please answer in detail.
Which are the top apps for you civil engineer?
For 1 bag cement how i will calculate sand and metal aggregate;Here the mix proportion is 1:2.49:2.38
I have an plot with area 35*47 = 182.77 sq yards. Out of this iam planning to construct house with 1350 sqfeet each floor .iwanted to build a G+2 house.Need cost estimation for each item
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.