The customer has a requirement to cancel the release of the PO in case of price change in the PO after the approval. Which one of the indicator plays an important role?

Answer Posted / iamvijayadav

Release Code or Release Pre Requisites or Release Group or Release Indicator?

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is a consignment stock?

647


Explain the 'storage location' in sap?

735


How to delete a batch?

670


Differentiate between release procedure with and without classification

662


What are the commonly used movement types in sub-contracting process?

785






How you can link a document to a vendor master record?

732


What is non-valuated material?

691


Which documents are generated in migo 101 movement type? Which accounts are effected in the process?

740


How can you disable a reservation in mrp?

949


What is the difference between contracts and scheduling agreements?

631


If there is a pipe and you send it to a sub-contractor to be cut in to two or three pieces. How will you map such scenario in sap? Will you create separate material codes for each pipe with different length or what will be your approach?

824


What are the various steps of the mm cycle?

686


What is Material Document & Accounting Document in SAP MM.......

1037


What happens when a goods receipt is posted?

625


What are the possible values of procurement type in material master?

712