Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Number of cement bags required for concreting 1000 square
Feet slab of 4 inch thickness.

Answer Posted / sindhu

If grade is M10 (1:3:6), cement in kgs per cum is 266kgs
1000 sq ft
4 inches=4/12=0.33ft
1000*0.33=330 cft
330/35.315(1 cum= 35.315 cft) = 9.344cum
9.344*226(cement in kgs per cum) =2111.85 kgs
2111.85/50(per bag) = 42.23 bags

Is This Answer Correct ?    2 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

the magnitude of the buoyant force can be determine by newtons law of viscosity archimidies principal principles of momemnt none

2236


Explain what are the problems one might face while having a Cantilever balcony?

1389


what is right & short method of measurement of slab&beam

2166


What Reinforcements Are Used In The Process Of Prestressing?

1376


How did street originate in the plumbing term street ell?

1070


What is the sugested procedure of water purification for public supply?

2369


what is pqc

1826


how much cement and sand required for 100sqm of wall plastering in different proportions

2448


hai, kindly send anyone for output workers format details for construction project in foundation to finishing.

1567


One plate (women civil worker lifting Plate - Satti) sand measures how many cubic feet?

2418


what are the types of design? which type of method is used at what type of design & why?

2245


How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel

1909


how to absorb to site basic corrections? which are the important correction?

1541


What are the causes of building collapse?

1220


what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?

2195