MRP Procedure:
1. Material requirement planning.
2. Master production schedule.
3.Consumption based planning
3.a. Reorder point planning
3.b. Time phased planning
3.c. Forecast based palnning
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Steps to configure Production order type.
What is Inspection Points?
What is opening period?
How system calculate the actual cost?
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
How do you integrate HR (employee) with PP?
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
How the processing time is calculated in a wc when both labor, machine categories exist?
What are all the settings done for configuring the integration of pp with fico?
How the process time is calculated in a wc when both labour, machine categories exist?
What is the use of infogroups?
We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?
What is MRP Area or How can I excluede one storage location stock from MRP?
What is process keys
Explain the uses of the simple maintenance interface?