Answer Posted / ajit1983
The finished goods (Material) for which you are creating a BOM is called Header leve. for finished material if you have components like "A" and "B", this level is called 1st component level. if you have raw materials "c" and "d" for semi finished goods "A", this is called 2nd level BOM and so on.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Define gaps.
What is mrp controller means?
Splitting of production order & product version
Explain In-process inspection.
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
What is the difference between “planned consumption” and “unplanned consumption”? Can safety stock calculation be done on either of these?
Hi All, In Repititive manufacturing during backflush we enter the production date and the batch. The classification for production date and Shelf life expiration date has been maintained in the material master. We have a characteristic "date of last goods reciept"which updates the characteristic value in the batch classification automatically from the production date entered in MFBF Tcode. Even though we have maintained the min shelf life and total shelf life the system does not calculate the remaining shelf life for the batch and does not update the value for shelf life in batch classification. Please suggest the procedure for updating values in batch classification for shelf life automatically from MFBF Regards, LN
define variable cost
What is the planning horizon?
Explain what is the need of mrp list if the stock requirement list is already given?
What is the use of stock requirement list?
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
Differentiate ‘variant bom’ from ‘multiple bom’?
Question related to Production order status or status profile?
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?