How will u integrate existing ecc6 environment into solution manager
Answer Posted / ramanji436
-->First we nned to reflect the existing system in to landscape.
1.Run RZ70 and schedule the LMDB Jobs.
2.Login the landscape directory and check weather ecc6 system was reflected or not if not repeat step1.
-->Login the solution manager and follow the configure steps
1.Run SM_SETUp and follow the steps to add the ECC6 system in to solution manager.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain the system trace?
What is the purpose of tdevc ?
Explain segment?
steps to congigure CMS in XI ?
what is garbage collector. is there any way to set the time to gc?
Where is the Deletion Flag or Indicator used in archiving process?
what is the common storage file for oracle ?
what is your project architecture?
What is luw (logical unit of work)?
In what ways you would know whether a system is unicode or non-unicode?
What will happen during the export process?
how can we set a/r a/p netting for inter company code transactions? is it possible to do? if yes, give the solution?
Briefly explain a recent problem you faced, which u felt proud by solving that? And how will u solved?
Explain what is “data sets” in sap?
i'm new for security, pls help if assign the t-code to parent it wll effect to child role or not. can we assign to t-code directly to child role? it wll work or not?