How will u integrate existing ecc6 environment into solution manager
Answer Posted / ramanji436
-->First we nned to reflect the existing system in to landscape.
1.Run RZ70 and schedule the LMDB Jobs.
2.Login the landscape directory and check weather ecc6 system was reflected or not if not repeat step1.
-->Login the solution manager and follow the configure steps
1.Run SM_SETUp and follow the steps to add the ECC6 system in to solution manager.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is sap single stack system?
What are the key activities that you perform as part of sap basis support?
Explain the system log?
what is netweaver
Hi ,All What is the multi-threading and max connections for rfc. Actually i am facing problem while send large amount of idocs to external system using middle ware tibco r3 adapter. And how to enable these in SAP ?
What is the system's configuration required to implement SAP.
How do I know what threshold values to set
What is the difference between kernel replacement and support package?
What is the purpose of support package?
How to apply java stacks ? expalin step by step prcoess
Some transactions in sap are seen as customizing, for instance ovrf (updating routes). In some systems this is set as master data and can be set open. Where do you do this?
I also wanna work with Webdynpros? What are the requirements? I mean SAP 4.7 ee or ECC 5 or 6? Netweaver developer Studio? Also with win 2003 i have the activation problem every month. SO do i get a cd that doesnt ask for the activation? i have win 2000 but can it be installed on HP pavilion laptops that are coming preinstalled with Vista OS?
How to add authorizations, how you will maintain profiles?
What is the difference between consolidation and development route ?
What are the regular activities u do in solution manager and how