Answer Posted / faiyaz
pre commissioning is the process of providing the ability of a pipe line and piping system to contain product without leaking
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the start up procedure of desalter
Why all the drains(Gland sealing,ESV,Casing inlet etc) are directly connected to the flash tank instead of hotwell of the condensor in the power plant? My Email Id:naba02222@gmail.com
How to Calibrate Interface Level Troll in field
List three types Level Gauges with their working principles
-/5A. What is the meaning and limitations of this in energy meter constant. It is a 3 phase LT Energy Meter. If this Energy Meter is connected through a CT of ratio 200/5 Amps, then what is the multiplying constant and how its will be calculated.
Somebody can explain me about >Critical Loops, calibrations, ESD critical Loop checks, Logic Diagram / Cause & Effect checks for ESD loops,
when the instrument tapping on pipe line is located below and transmitter is located above the tapping point for liquid service transmitter, what should we do, is there any additional drain valve is required??
what is the criteria to decide conductor size of a cable ?
we are having yokogawa centum cs3000 dcs in our power plant. i need some of the operator guides NOT to appear in HIS0163 AND HIS 0162 but it shoul appear in HIS0164 HOW TO DO IT?
what is the procedure to callibrate temp controller ,pressure controller,etc. suppose a temp controller showing error 1.5 degree centigrate how can i minimize it.
what is 24vdc live and dry supply
What is defferent betwen ESP &PCP PUMP .HOW IT IS WORK?
why we use cascade control and feed forward control in 3 element drum level control measurement of steam drum .what is cascade and feed forward control system ?give example .
when placing a vent or drain hole on an orifice plate should you measure from the center of the bore up or down for the vent placement?
Explain Gas Turbine startup and shutdown sequences