1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / aamu
Generaly we cosidered as a wall of thickness of 9"
Then when we calculate no. of brick per sq.ft. then we should consider above thick.
let cal. no.of brick/sqft = (12"x12"x9")/(8.5"x5.5"x3")
=9.240
Then if we add thck of mortar 1/2"(12cm) no.of bricks= 9.010
Total no of bricks in one brass
= 10x10x9
=900
and also add 5%wastage.
Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Minimum concrete cover in slabs, columns, beams, foundation and other st?
What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?
types of survey and levelling instrument ?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
what is civil enginnering & what you need of this course?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
What in bending moment, if a moment is free end of cantilever beam?
For what purpose bedding is used under storm water drains?
Is there any course for billing available in Mumbai? If yes then please mail me the details..
For the calculation of bearing pressure below the footing, to know whether it is below the safe bearing pressure of the soil, the unit of RCC below ground level to be taken is 25 KN/m3 or (25-15)KN/m3, where 25 is the unit weight of RCC and 15 is the unit weight of soil and whether the weight of backfilling to be taken?
I am practising engineer. I am searching for tutorial of RCC T Girder design Example in staad pro.Do anybody has this?please help
construction workers how much time take one work or qty
how to calibrate the RM 800
quantity of sand and cement for 10m2 plastering 10mm thick for the ratio of 1:4,1:3and its leabour data
Which code specifies the specification ofthe construction joints to be provided in the raft slab of a basement which is 6 m deep.what should bethe detail of such a joint?