Answer Posted / nijagunayya hiremath
Dry lean concrete is the base for rigid pavements and is mixture of large ratio of 20 mm dn. Aggregate to cement usevally 14:1and cube strength shall be 5 N/ sq mm.
It has to be laid with paving equipment. It should be covered before putting above pavement layers by thin polythene sheet.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is pouring and explain
What is the difference between a wood shake and wood shingles?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
(Project Management Topic) What are the important criteria in the successful realization of the project?
What is the difference between absorption & adsorption and sorption?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
why is the column design?
What distance in meters on the ground is the equivalent of one second of arc in longitude or latitude?
What is the difference between Grade I, II and III of GSB?
What is meant by cad?
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
Why should pumping be not used in case of concreting work?
how to find quantity of concrete in PCC M15
You have 3 snd sample of different FM=0.21,FM=0.95,FM=2.90 which one is suitable for a)plastering on R.C.C b)plastering on masonary wall c)concreting column d)concreting of bored pile.also justify your answer.