How to calculate the Airconditioner capacity for a standard
telecom BTS shelter?
Answer Posted / gajanan bharad
I am too seeking right answer, but I know that the calculations above are incorrect. We have to consider the heat generated by BTSs and not the power consumed by BTSs. We have to take into account the heat generated/ rate of heat generation in Watts by all the equipment inside the shelter. There are 48V SMPS, Battery sets, BTSs, Microwave equipment, lights and assume 2 persons working. Heat generated by the SMPS equals input power minus the output power (i.e. loss of energy in terms of heat). But for rest items need the information on heat generated. Then only we can arrive at correct air conditioner capacity requirement.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
we have require a Motor (1500kW, 6.6kV, 50Hz) which shall operate at 1500rpm during 30min and after it shall run on 500rpm during 15min. The same cycle shall be repetitive during the whole working days. Which method is best and economic to achieve such type of task. VFD, VVFD, Pole changing motor etc.
checking procedure of capacitor based motors.used in fans etc?
in india per day how much power is generated including all power station
what will be the effect if you were using different brands of outlets?
What is float cum boost charging system?
What is mason's gain formula?
How to calculate no of EARTH PIT? Describe the formula as per IS standard?
can the measured percentage error during calibration of single phase energy meter be negative?
Ac generato how produce power I need for camplet defination
Explain about retrofitting of machine tool.
How can we select suitable capacity generator for three phase load (inductive load) and how to take study analysis in 3 three phase load system ?
explain PV modules in solar energy generation.
why only exciting current is shown not primary current in transformer???
ult of expression 'document.FrmQF.myem
what is meant by 3rd hormonics ?