how much quantity of cement(bags)concrete(20mm)and
sand(sqft)is used in 1:3:6 PCC

Answer Posted / thamaraikani btmh site annanag

1:3:6 PCC cement, sand and aggregate quantity:
Cement=4.5bags
Sand=15.8913cft
Aggregate(12mm)=12.7144cft
Aggregate(20mm)=19.0716cft

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the l/d ratio of cantilever beam?

1427


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

1937


What is thumb rule for deep trench excavation

1312


Explain creep?

682


What is a tensile strength? What is the tensile strength of wood?

662






In earth work 1300 cum soil how to calculate how many liters require in water

1992


how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.

1955


what is Brest Wall?

810


in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?

1796


the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm

1877


Questions related to civil.engg in company

1568


Explain what are the phases inspections are done by local authority while construction?

735


sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.

2400


In csae of hume pipes NP stands for Non Pressure bur what does it really mean?

1808


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

1647