what is lead lag compensator and for wat v using that???
Answer Posted / prabudas
Compensator is used to compensate the deficiency in the performance of plant.
A lead compensator is used to improve the transient response and the steady state response is partially improved.
A lag compensator is used to improve the steady state response and the transient response is partially improved.
If we need a better transient response we should choose lead compensator.
If we need a better steady state response we should choose lag compensator.
If we need both transient response and steady state response we should choose lead lag compensator.
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Please can anybody help for control valve sizing step by step procedure?
Draw a complete P&ID of a flow suction tank indicating all control & protection equipment. Indicate all its inlets and outlets. Explain the controls for this system
PT RTD Range: -200 to 500 degree celsius If I configured in DCS Lower range and Upper range . In face plate it shows red colour due to overa range how was the characteristics look If the temperature is more than operating range. how was the characteristics look . whether its in Resistance vs Temperature curve is Linear or Non linear
How many ohms are required for proper earthing?
what is wave length were using ?
what is function of switch, and how is it work, explain with difination
Explain the difference between mmwc and mmwg?
how to change measuring units from mmwc to cubm/h in rosemount air flow transmitter with hart communicator fluke 744
OBJECTIVE TYPE QUESTIONS OF ANALYTICAL INSTRUMENTATION
Why do you want to work here
Differentiate between ultrasonic flowmeter and radar type flow meter
why Fahrenheit unit of moistur analyzer transmitter
What is surge and how is it prevented, what is the purpose of bypass valve across AS valve.
i have steam drum height 1000mm. and i want to placed the transmitter below the tap.how i calculate.
what are the documents(Construction point of view for a process plant) submitted by contactor initially entering in to new site for client?