Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how do you calculate IKW(consumption per TR) in HVAC?

Answer Posted / balram singh mnadloi

TR= (delta T*flow)/(3.5*0.86)
and
KW=(1.73*V*I*PF)/1000

Then you have to divide TR by KW so you find Ikw of chiller

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

i installed 100kva ups. what KVA genset they should provid in input side? plz any update formula or ans with reason.

2356


what is diff. between earthing grid,earthing mess, earting grid?

2417


Why earthing is necessary for any equipment?

1734


Define phase lag and phase lead?

1146


How is efficiency of DG set calculated? At many places I found the efficiency to be mentioned in percentage. But at some other places I found kWH/ litres. I want to know how dimensionless percentage value is arrived at?

1931


what size steel armoured cable is required to support 1500kva capacity. would 70mm squared be enough or would I need 90 or 120mm squared 3c plus earth

1392


in a simple IDMT relay we use neutral point of ct for earth fault then what is the requirement of neutral ct and cbct?

2176


how to measure the current by compact digital equipment with dislay which fit inside any equipment

2000


what is two point starter?

2133


The efficiency of a 100kva transformer is 0.98 at full load as well as half load , for this transformer what is the Copper loss at full load ?

2340


According to underground cables a) stress b/w sheath & conductor is high b) inrush of core & conductor

1984


Can anybody post questions asked in Engineers India Limited Interview? Thanks in advance.

2395


We are preparing another project which involves Waste heat recovery from a 1 MW GE Engine. The Engine in particular gives out flue gas at 487Deg C with a flow rate of 5650 kg/hour and this can be cooled to 180 Deg C. This gives a thermal output of ~ 594 KW that is available for input to VAM via heat exchanger / boiler. Additionally 581 KW will be available from engine jacket water (temperature profile 80/ 80 Deg C and a flow rate of 50m3/hr) Our estimation is that 300 TR of cooling is possible with a suitable VAM machine(s). Please advise what is the most suitable arrangement with maximum TR and min Capital expenditure. plz reply me as early as possible

1998


WHAT IS LOAD CELL

2162


What is called grain-oriented laminations?

1183