Answer Posted / kumar
MRP will not check the Capacity . MRP was based on the unconstrained plan in ECC.
Capacity check and Capacity level needs to done in separately.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is the major ticket in your experience
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
What is costing? How it is affected the pp?
Scheduling times can be defined in the material master record by?
What is MRP Area or How can I excluede one storage location stock from MRP?
What is it 41 used for?
What is finite scheduling?
Explain the mrp group and their uses.
What is MRP procedure
What is activity type and how it works in costing?
Where we have to specify the teardown time in one operation?
What happens to planned after it has been converted into production order ?
What is purpose of schedule margin key?
What is the use of stock requirement list?
If u maintain sub-contacting where and how will be reflect