Can it be configured in such a way that the external
requisitions can also be taken into account while MRP runs
in consumption-based planning if VB is selected as MRP type?
Answer Posted / raghu
Use MRP type - V1 Manual reord.point w. ext.reqs
In OMDQ you can check which external requisitions are considered for this MRP type, you can customize a new one for your specific need.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How to delete a material completely?
What are purchasing information records?
Name some of the data points provided by purchasing for the materials.
What is the procedure to make the source list automatically appear in material master as default if maintained at plant level using ome5?
A stock transfer was done between two plants belonging to same company code and between two plants belonging to different company code. What will be the difference between the two?
What is mrp (material requirement planning)?
What is sales order stock?
Hi, I have 7+years experience In purchasing a new and doing sap-mm training, how is market for mm and how to find job as sap consultant, Pl help,
What is the use of ‘info update’ indicator in purchasing documents?
If there is a pipe and you send it to a sub-contractor to be cut in to two or three pieces. How will you map such scenario in sap? Will you create separate material codes for each pipe with different length or what will be your approach?
Explain the types of subcontracting stocks in sap mm
What is a business area?
What is the organizational structure in the mm module?
Outline the functions supported by material master?
What do you mean by consignment stock?