Can it be configured in such a way that the external
requisitions can also be taken into account while MRP runs
in consumption-based planning if VB is selected as MRP type?

Answer Posted / raghu

Use MRP type - V1 Manual reord.point w. ext.reqs

In OMDQ you can check which external requisitions are considered for this MRP type, you can customize a new one for your specific need.

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How do planned and unplanned consumption affect movement types?

863


When a sales order contains normal(norm) and third party items(bans) how does the material reacts? Next order comes as make to order(0001), another is BOM. So every time we have to change the item category group in mm02 OR is there a process to expand the same material with norm, bans, 0001, erla?

1956


What unique insight into this upgrade does infotrellis have that other vendors don’t have?

842


Explain the 'storage location' in sap?

735


What is sap? How is it used in industries?

656






How are free items managed in a po? You need to tick the tem as free in the po. The price will be zero for such po's.

734


How much effort is it going to take to implement?

600


Do we include consignment stock (material provided by vendor) in physical inventory? Why?

684


What is the importance of client in sap?

653


What do the xd01 do?

693


What is cbp?

647


What do you mean by a reservation?

670


What is split valuation? What are the settings reuired for it?

858


What data does the information record contain?

663


Explain how is the vendor return processed without a purchase order reference?

710