how much quantity a carpenter do shuttering per day

Answer Posted / visha patil

4.5 sq/m work per day

Is This Answer Correct ?    5 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

where can i get the previous question papers for rrb section enginerr (civil)

1864


Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day

1582


As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.

1491


Forces in a Shear Wall are in plane or out of plane ?

660


Which purpose we use deck anchor in bridges?

639






How much of the strength of concrete comes from post- production curing?

2646


IS code for grade of concrete for bamboo lintel????

1684


I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.

1559


What is difference between combin footing & rapt footing

1126


Define What is the difference between routing maintenance and major maintenance in school facilities?

741


What is the origin of name railway sleepers?

838


How much material is required for constructing a 2 Lane 2Km rigid pavement road

1730


What is the software used in civil engineering?

657


Reinforced concrete: suppose you are doing rough estimate for purchase of rebar for reinforced concrete slab for single stores residential building. You know total concrete volume will be 100 m3. How many tons rebar 6, 10 and 12mm will you require for the project?

2387


factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard

1665