Is it possible to make 0.75KW motor earthing from MCC panel by
using the 1.5 SQMM, 4 core cable, means 3 core for 3 Phases &
1 core for Earth terminal?
Answer Posted / jyotiranjan sahoo
Yes it can use 1.5 sqmm cable of earthing for that motor but in Indian standard we must be use another body earthing
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
can any one suggest me the tilt angle of my solar pannel ?? or tell me how can i know the fix tilt angle of my solar pannel?? my cordinates are 31.503629,72.993164.
What is expention fastener (Fan)
What is the use of iron core in a transformer?
a)In a 3-phase 4-wire circuit, a circuit breaker is selected to protect the circuit whose highest fault level is 6.6 MVA. Determine the required minimum breaking capacity in kA. (Note: Covert 3-phase power in terms of kA to find answer.) b)Using the below, determine the required minimum making capacity in kA as a “peak value”. Rate breaking capacity (Icn) ka: Icn<= 1.5 Factor = 1.41 1.5
What is meant by RVT and NDR ? expansion and details of it
What are the no-load losses for the 11000/415V transformer with the following rated capacity? 1.1500 kVA 2. 2000 kVA 3. 2500 kVA 4. 3000 kVA
WHY BREAKER ARE USED IN SUBSTATIONS?
What happens if the series current double?
how to calculation increase power factor for single phase
THERMAL CAPACITANCE IS MEASURED IN..................................................
why they were using TRIAC instead relay in some controllers and what is the advantages.
how much allowable resistance that can be difference in motor all coils?
During underground cabling in landscape area what did we cover the cable with to prevent the electric shock & protect the cable?
A commercial Building is designed with 14th floor levels with indoor substation of three phase transformer with rated capacity of 1000 Kva.The transformer delivered 65% of its rated capacity at 0.67 power factor lagging.Because of low power factor, the power customer was penalized and certain cost was charged accordingly based on every point percentage lower than 85%.This situation may repeatedly happen on the succeding energy bills of power customer.The power customer is desired to improve its historical power factor of 0.67 lagging and no further penalty be impose by the local power company on the next bill. Q: Identify the appropriate solution you want to offer to Client?.Justify SCIENTIFICALLY and MATHEMATICALLY the principles behind the solution.
What is the formula formula for Busbar sizing and what are the things to be consider for Busbar Calculation?