what is plate load test and what is the procedure of it and what is accessories which in use
Answer Posted / furqan
What mr waheed said is correct. Its used to know the bearing capacity of soil with loading plates of different sizes on the actual site. The procedure is that you will need the instrument with JCB and at least 2 worker. You have to fix the plate on the specific land or place. Fix all the guages. Then apply the load on plate by jcb and take the reading on machine. You can search on youtube
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
how to compute slab reinforcements on step by step procedures??
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
What is meant by Crystal Concrete?
How did street originate in the plumbing term street ell?
What year was the keystone power plant in Indiana County constructed?
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'
Which are the top apps for you civil engineer?
what is directivity effect?
what is the use of beam end forces while using a staad ? wha they are show
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
how to calculate MR 9(derivation)