how much quantity of water is required for main wall brick work, partition wall brick work,and for internal and external plastering and how it is calculated?
Answer Posted / vinay
if they give the give w/c ratio then we can calculate water quantity.
for eg if 0.3 is the w/c ratio then,
w/c=0.3
then 1 bag of cement contains 1.25cft so, 0.3*1.25= 0.375cft
1cft contains 28.34 litrs of water then 0.375*28.34=10.625 litres of water is required for 1 bag of cement, generally here for dry volume of concrete is taken as 1 and half times the wet volume i.e 1.54
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
What is a projection line?
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
what is meant by residual strain?
Why is concrete cube test carried out?
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
will fix foundation bolts at site with out template is there any procedure?
cement and sand required for one block of size 0.23*0.15*0.46
Define What is aggregate?
how to calculate the size of triangular ring in rcc column?
List out some of the software used in the construction sector to estimate cost and monitoring expenses?
Is it possible to make a feature using an overdefined sketch?
What is zoning permit?
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?