1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / prithvi
For 1cubic meter:
No.of bricks with motar is 392 but say 400,
Cement is 1.5 bag,
Sand is 0.23 to 0.275 depends on motar ratio,generally we consider 0.26cu.m of sand
Any doubts please contact on watspp to 9010557759
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
i want texture painting pwd data
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
What is OSHA compliance?
1. What is coefficient use for calculation of shuttering. 2. What is coefficient use for calculation of reinforcement in one cum of concrete.
Define a polyline?
Where is the worlds longest elevator and how long is it?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
Process of pcc in wateredug
An interior designer designed a rack with the given dimensions. The dimensions are in feet. This coplanar frame repeats at every 5feet and constitute a space frame. The total length is 120feet. Which steel member will you suggest? A square bar, A square tube or a circular tube. Explain.
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
How to calculate the quantity of ingredients of M20 grade concrete?
At what point does a circle start losing area when being flattened?
What are the methods of measurement? Describe it shortly
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
What are the applications of modulus of elasticity?