Answer Posted / pradip chaudhari
MPS means master production scheduling which is used for high cost level material having high value and MRP is used for comparatively low cost level material
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
How the processing time is calculated in a wc when both labor, machine categories exist?
Difference between MD01, MD02 and MD03.
Explain what happens to planned after it has been converted into production order?
What is the uses of production scheduling profile and what the configure have you done current project
Explain how ‘pp’ is ‘integrated’ with other modules?
How to group employees for their allowances in payroll?
Can’t one material be assigned to more than one operation in a routine?
Can any body explain me why work scheduling view is required for semi finished and finished products?
What is Schedule Margin key. How floats works in scheduling?
What is 'mps' (master production scheduling)?
Can't one material be assigned to more than one operation in a routing, why?
How to create prt master records?
Difference between different strategy groups.
Explain the stock requirement list and their uses.
Difference between Routing, Ref op set, Rate routing and Ref rate routing.