What is MPS and difference between MRP and MPS?

Answer Posted / pradip chaudhari

MPS means master production scheduling which is used for high cost level material having high value and MRP is used for comparatively low cost level material

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the role of an administrator in pa?

618


Define 'sop' (sales & operations planning)?

718


What are basic dates?

639


Can’t one material be assigned to more than one operation in a routine?

547


What is the difference between the fixing type 1, 2, 3, 4?

5191






Explain why their is need of production version ?

614


Explain Flexible planning Procedure?

1665


What is Phantom Assembly?

1081


What is the use of sap material view and list out other parameters where sap material view is applicable?

582


How can you create production order without routing and BoM?

1030


What is the planning time fence?

603


After doing realization how we will check whether it is working or not?

599


What is the use of QM control key?

2226


How is indian slab and us slab?

632


What is mrp list and what is the use of it?

609