Answer Posted / pradip chaudhari
MPS means master production scheduling which is used for high cost level material having high value and MRP is used for comparatively low cost level material
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
List out the basic procedure for dispatching operations in capacity leveling?
What is the use of infogroups?
What is MRP procedure
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
list the important tables used in pp.
Mention what is the t-code for changing production order and to display production order?
What is the use of stock requirement list?
what are Standard keys
Explain the stock requirement list and their uses.
Question related to Production order status or status profile?
Define mrp list
How is indian slab and us slab?
I have having 14 years manufacturing experence & 6 years in SAP-PP/QM.Was a core member during implementation.Now I want to work as Functional Consultant in SAP-PP/QM.What should I do for getting the jobs.
Explain what is prt (production resource tools) in sap pp?