Answer Posted / pradip chaudhari
MPS means master production scheduling which is used for high cost level material having high value and MRP is used for comparatively low cost level material
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is the role of an administrator in pa?
Define 'sop' (sales & operations planning)?
What are basic dates?
Can’t one material be assigned to more than one operation in a routine?
What is the difference between the fixing type 1, 2, 3, 4?
Explain why their is need of production version ?
Explain Flexible planning Procedure?
What is Phantom Assembly?
What is the use of sap material view and list out other parameters where sap material view is applicable?
How can you create production order without routing and BoM?
What is the planning time fence?
After doing realization how we will check whether it is working or not?
What is the use of QM control key?
How is indian slab and us slab?
What is mrp list and what is the use of it?