Answer Posted / pradip chaudhari
MPS means master production scheduling which is used for high cost level material having high value and MRP is used for comparatively low cost level material
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Explain why there is need of production version?
How do you restrict the data to be entered in the payroll area?
Control keys
Explain Flexible planning Procedure?
What is alternative BOM, or diff between BOM group and Group BOM?
What is MRP group?
What is MTS and MTO and the difference between them?
What is Auto GR?
How to create object dependencies in a bom for a configurable material?
what are the problems you faced in MRP?
Why the work scheduling view is required for semi-finished and finished products?
How to insert an inspection checkpoint at the end of an operation?
Explain what is prt (production resource tools) in sap pp?
What is phantom item & sub contracting
Mention what are the production process in sap?