Answer Posted / pradip chaudhari
MPS means master production scheduling which is used for high cost level material having high value and MRP is used for comparatively low cost level material
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
What is Schedule Margin key. How floats works in scheduling?
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
what are the settings needed for variant configuration?
How does sap know that an operation has components as indicated by the component allocation indicator?
What are the keyfields found in mrp view 1?
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
Mention what are the types of master views for production and planning?
What is sap pp?
Where we have to specify the teardown time in one operation?
what do you mean by opening periods
What is activity type and how it works in costing?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
What is mrp group and what is the use of it?
What is planning file entry