Answer Posted / pradip
variant material means the material is to be used for many times in diff bom. ex if a company manufacturing diff types of bicycle then the bom is also diff but if some material is same for all bom then we treat that material as a variant
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Integration between PP and PM module.
How do I find which is the recurrent item in a production order? In the missing material analisys I got message MF 331, but the BOM or the production order don'thave any recurrent item Thanks
What is finite scheduling?
What is alternate item group?
How system calculate the actual cost?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
What change management functions do you require? How do you want to define the validity of BOMs (based on date/freely definable parameters)? Must existing change histories be transferred to the R/3 System?
In project the customization is comes under which phase?
Define mrp group
What do we do in realization phase?
What is end user training
how many times pcc can run for one material?
What is primary cost and secondary cost?
what is group bom? Is it possible to attach the drawing for a material to bom? How?
Explain PI sheet.