Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

NATURAL GAS ENGINEERING - QUESTION 26.1 : (a) In natural gas pipe sizing, the length of the pipe from the gas source metre to the farthest appliances is 60 feet. The maximum capacities for typical metallic pipes of 60 feet in length are : 66 cubic feet per hour for pipe size of 0.5 inches; 138 cubic feet per hour for pipe size of 0.75 inches; 260 cubic feet per hour for pipe size of 1 inch. By using the longest run method : (i) Find the best pipe size needed for the capacity of 75 cubic feet per hour. (ii) Estimate the suitable range of capacities for the pipe size of 1 inch. (b) The maximum capacities for typical metallic pipes of 50 feet in length are : 73 cubic feet per hour for pipe size of 0.5 inches; 151 cubic feet per hour for pipe size of 0.75 inches; 285 cubic feet per hour for pipe size of 1 inch. By using the branch method find the best pipe size needed for the capacity of 75 cubic feet per hour when the length of the pipe from the gas source metre to the appliance is 52 feet.

Answer Posted / kangchuentat

NATURAL GAS ENGINEERING - ANSWER 26.1 : (a)(i) Best pipe size needed = 0.75 inches for the capacity of 75 cubic feet per hour. Data for a metallic pipe of 60 feet in length and maximum capacity of 138 cubic feet per hour instead of 66 cubic feet per hour are selected. (ii) Range is more than 138 but less than or equal to 260 cubic feet per hour for pipe size of 1 inch. (b) Best pipe size needed = 0.75 inches for the capacity of 75 cubic feet per hour. Data for a metallic pipe of 60 feet in length instead of 50 feet and maximum capacity of 138 cubic feet per hour instead of 66 cubic feet per hour are selected. The answer is given by Kang Chuen Tat; PO Box 6263, Dandenong, Victoria VIC 3175, Australia; SMS +61405421706; chuentat@hotmail.com; http://kangchuentat.wordpress.com.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

design calculations for reactor

2621


Explain the factors involved in designing kettle type reboiler?

997


I am pg student of chemical engg. I am intrested Heat Transfer Subject . I want information about advance heat transfer related PG PROJECT

2323


Explain the common failure mechanism for above ground atmospheric storage tanks?

1066


white rust formation over zinc plated and yellow passivated fasteners during CED painting. WHY?

2521


What are some characteristics of bulk solids that can affect their ability to flow properly?

1159


Explain what are the advantages of using gear pumps?

992


i have done B.TECH in che.tech.and doing MBA . why you doing mba why u have not join any job.

2303


marketing procedure of iocl

2376


How can you quickly estimate the horsepower of a pump?

1241


What is the difference between cfm (cubic feet per minute) and scfm (standard cubic feet per minute)?

1227


Can any one send me the sample test papers of IOCL entry exam to be held on 6th july 2008. Also plz send the interview questions that cud probably be asked........i wud be highly obliged if u can send a few test paers and other stuff @ inderjeetd@gmail.com.........Inderpreet

2702


Explain the largest application for surfactants?

1060


what is the difference between car seal close/open valves and lock close/open valves?

5483


What is a quick way to calculate frictional pressure drops in carbon steel pipe?

1084