Answer Posted / mohamed ibrahim
variant means that you have the same components with various product
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
I have having 14 years manufacturing experence & 6 years in SAP-PP/QM.Was a core member during implementation.Now I want to work as Functional Consultant in SAP-PP/QM.What should I do for getting the jobs.
We want the system to run a single level mrp automatically on receipt of sales order. How to configure triggering event based mrp?
How does sap know that an operation has components as indicated by the component allocation indicator?
What do you mean by pooled capacity?
What are sequence, parallel, overlapping, splitting and where can we assign these
Control keys
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
Are there any reports in sap to list of material requirement from ltp ?
Can't one material be assigned to more than one operation in a routing, why?
What is the data you give in S.O.P screen?
How many levels of Flexible Planning are there?
How system calculate the actual cost?
Tell one biggest task for you
What is the production process in sap?
Why work scheduling view is required for semi-finished and finished products?