• What types of scrap can be maintained in PP basic data and
how would they be considered during MRP repectively scheduling?
Answer Posted / mohamed ibrahim
types of scrap
1- assembly scrap
increasing the assembly % in prod.order consequently increasing its components
maintain it in MRP1
2-component scrap
one component loss of QTY during production that's require increasing its QTY.you maintain this in item details in BOM and in MRP4 view
3-operation scrap
during an operation, there was a loss of QTY that require the operation scrap. you maintain it in BOM item details with check NET ID that indicates the QTY loss and also in a routine that indicates the activity loss
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What are the customer activities followed for pp module ?
What is meant by slab?
What is Auto GR?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
What is the uses of production scheduling profile and what the configure have you done current project
Explain In-process inspection.
What are the t-codes for creating, changing and summarizing bom?
Explain the planning steps for 100 products?
What is pi sheet
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
What is the planning horizon?
Explain PI sheet.
Explain the Difference between the Discreet and REM.
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
Explain LTP.