why we do multiply 1.54 for dry volume of concrete?
Answer Posted / subhendu suman
Is this factor is mentioned anywhere in IS code?
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
what r you reqired for concrete baching plant?
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
Does brick grows bigger every year?
Slump Values for works?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
How to arrive dry volume of concrete (1.52 to 1.57) ?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
What is meaning of FREE STANDING STAIRCASE ?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you
can i get hindi version of is codes based on civil engineering?
1m square 20mm plastering how much of water need curing work
Explain major differences between routing maintenance and major maintenance.
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
How to do rate analysis for concrete work including shuttering work?