Answer Posted / suraja
They are mainly used for two purposes 1-when turbine gets tripped msg stop valves and reheated stop valves will be closed in order to evacuate the steam from hp turbine it is used to dump into the condenser.
2-when turbine is being rolled these lines are used to maintain or increase steam parameters such as temperature and also it will allow a Drain condensate to condenser. It is taken from crh line to the condenser after unit synchronised it will close in auto those dump lines will be provided with spray valves.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
why is the in steam turbine axial displacement of active side thrust pad is positive and non active side thrust pad is negative.
How to calculate boiler capacity? I have 1 Autoclave, Which has to use for AAC block. Dimension for this Autoclave is - 13 Meter Length & 2.2 Meter Diameter.
How do you consider that you can improve and what assistance do you need to achieve this
what is the meaning of SST300 V56A in SIEMENS turbine
Why superheated are started before I'd and rd fan?
what is the basic use of power plant in equipment
explain how the third harmonic content of the magnetising current affects transformer design
operation
why airtel use + 24 volts and other operators use -48 volt
What is LB-SR.
what is natural frequency of turbine shaft .
LAPT working in alternator / generator
dear sir i have completed one year post diploma certificate in thermal power engineering from national power training institute durgapur ...plz suggest me for power sector job
What is surging in a centrifugal compressor ? How it occur's ? How is antisurging done ?
Qatar Fertiliser Company (QAFCO) Shortlisted me for interview (got the intel from my source) for Field Operator- Utilities post. Please let me know what kind of questions they asked? ... this position requires 5 years of experience in Power Plant and background Diploma in Electrical/ Mech. ... my Background is Electrical and I am a sub Assistant Engineer (Operation) at a private HFO based Power plant... PS: Please Let me know what preparation should I take to obtain the Interview which will be take place In Bangladesh soon