Dowel is just a lapping to the reinforcement which is delibrately kept to cast the adjacent structure afterwards due to site condition. The length is given by consultant.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the strength of 1:6:12 mix?
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
water leak detection system question & answer
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
material used for mendrel use to bend epoxy coated rebar
HOw much % of premium on DSR-2013 currently
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
how can we calculate steel value, depending on load
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Why do you want to work here