How to calculate the no of bags required for 12mm thick 1:6
plastering?
Answer Posted / arun pandi
1:6 ratio, 12mm thickness plastering,
=1/6*1440 *0.012
=2.880 /50kg
=0.058 for 1msq plaster cement,
=100 Sq * 0.058
=5.76 bags for 100 Sqm area
Wastage = 25 %
So 7.2bags
| Is This Answer Correct ? | 11 Yes | 5 No |
Post New Answer View All Answers
While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.
plz.show development and anchorage length in simple diagram.
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
I need to constructive work in amaraj batteries
What is the per cu. mt. price of ready mix in Gujarat region.?
400 ku d/c clearess ketan hota hai?
What is the strength of 1:6:12 mix?
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg
VAT and CST ? Which benefits for buyer ? Why benefits?
sir I got selected in rail vikas nigam limited and they call for interview but i don't what they will ask in interview please guide me if you have any experience
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?