Answer Posted / sangeetha
i) Once the Bugs are posted in Bug tracking tool,Bug triage happens.
ii) It is a process where Issues in bug trackers are Monitored and prioritised.
iii) Triage should helps to ensure that we properly manage all the reported issues (bugs as well as improvements and feature requests)
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What is Test Design ?( Urgent) and Test Design for Printer?
Can anyone list out major scenarios for an application managing drug composition?
Is Anyone attended the manual testing interview with capgemini in recent past. please let me know the type of questions they can ask. Thanks
what is diffrence between dynamic black box testing and dynamic white box testing
tell me brief about your project? please help me how to explain the project what is the flow? my current project is ERP domain web based application. please help me
What is mean by incident logging system ?
How to test an application if it was already developed and it is in the state of changing the functionality according to the customer requirement How to start testing in this situation. I got an application to test.It is a desktop application.It is still developing and started 8 months back.how can i start to test this application? Is it the right way to test it in "Random testing"? or writing the testcases from page one and executing them.i have an another responsibility that is I have to automate that application. can anyone tell me what is the process to test this application.
1) Difference between "Delete" and "Concatenate" with reference to databases? 2) Difference between SDLC and STLC. 3) Latest versions of the browsers used. 4) What is URL Tampering? 5) Full form of URL. I don't need the answers. These are just for reference.
Write all combinations of test cases for calculater on + symbel
Hi i am looking for Test Engineer Job, i have done the course, but i don't have work experience on it, Is it So important to have real time Exp or knowledge is enough? and please let me know like how i can improve for the interview. You can send me a mail on this id: rashmi_vastred@yahoo.co.in
What does entry and exit criteria mean in a project?
i want to for technical interview question paper along with in tesrviwe Phases i need
What are joins and subjoins in the data bases what is data driven testing what is verification and validation What is Quality Assurance (QA) and Quality Control (QC) Is Verification is related to QA and Validation is related to QC ? which type of model you follow basically in your project what is a use case How to test a Bike how to test a Lift (Elevator). which configuration Management tool do you use which Bug tracking tool do you use explain Bug life cycle what is Regression testing what is ALPHA testing ans BETA testing What types of testings comes under Non functional testing what is TEST DIRECTOR what is CMM and CMM i whar are Expressions in Winrunner What is a Compile module Is it Necessary to open the tool first or the application first after getting a bug what will you do if you add a new object or a new module for the existing application then how will you test the application which Defect tracking tool do you use what is change management What is smoke Testing what is sanity testing A application is given to you but the requirements and functionalities are missing what will you do to start the testing which testing documents will be received by the client
How will you prepare traceability matrix if there is no Business Doc and Functional Doc?
Can any one suggest how to write the bug reports effectively by optimizing what we want to describe?