What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / farhat abbas naqvi
For deshuttering any concrete structure after pour to take in note the climate and design mix. For columns and beams sizes plays the major role. Usage of flyash also plays role in settling time.
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
What is Rankine Cycle?
how to preaper for interview wat they asked in interview give me idea
what is civil all interview questions
Explain the advantages and disadvantages of using plastic and timber fenders?
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
How to calculate brick work quantity?? Block work quantity??
will fix foundation bolts at site with out template is there any procedure?
Define What is the origin of name Railway Sleepers?
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
why we provide bent up reinforcement bars at l/4 ? if it is because of diagonal shear , how does it acts ?
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,
What is the quantity of metal 1 & metal 2 to be used in 100 cft concrete?
pls give me some basic informations in construction of a structure?
please send me bhel questions on rupesh.017@rediffmail.com
beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?