What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / farhat abbas naqvi
For deshuttering any concrete structure after pour to take in note the climate and design mix. For columns and beams sizes plays the major role. Usage of flyash also plays role in settling time.
| Is This Answer Correct ? | 4 Yes | 2 No |
Post New Answer View All Answers
how much cement and sand required for 100sqm of wall plastering in different proportions
Where can I get a Text Book on Design of Blast Resistant Buildings in PDF form.
what is constat for brickwork
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
How to construct a water sump in a rocky soil?
What is componsation
WET BULB TEMPERATURE AND DRY BULB TEMPERATURE?
Define a polyline?
specifications of fe500 steel
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
Which is the most prominent tower of world?
How much is the cover for slab?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.