I want to know the req quantity of cement for plastering 300
sft in final coat with 12 mm. Any math involved? Plz help
Answer Posted / sandip das simplex infr
Generally
Dry Volume=1.54 X Wet Volume - For Concrete
Dry Volume =1.35XWet Volume – For Mortar
Wastage not taken for calculation of Ingredient, it’s taken in quantity which to be calculated.
Percentage taken as per your choice (2-5%).
Now you know how to calculate the ratio.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Are cruise ships built for the transatlantic run?
Pls explain me about tension and compression in a flat slab
Write short note on construction programme for pile foundation.
how many shuttering material required for 1000 sq.m built up area.
how i convert mm into standard wire guage (SWG)no.
What is the difference between one-way slab and two-way slab?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
Will going from a 3-tap to 6-tap increase water pressure?
what is the types of surveying?which type of survey carrying for type of work?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
Why you are leaving present job?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
if 20mm aggregate is coming by weight 25 ton in a 10 wheeler hywa ,then what will be total volume of aggregate in cubic feet.
how beam.coloum ,slab, footing are designed as per indian code.. detail procedure?