The following are few of the common Test Stop criteria:
- All the high priority bugs are fixed.
- The rate at which bugs are found is too small.
- The testing budget is exhausted.
- The project duration is completed.
- The risk in the project is under acceptable limit.
Practically, the decision of stopping testing is based on
the level of the risk acceptable to the management. As
testing is a never ending process, we can never assume that
100 % testing has been done, we can only minimize the risk
of shipping the product to client with testing done.
| Is This Answer Correct ? | 17 Yes | 0 No |
Post New Answer View All Answers
I have a brand for product which will be delivered as per the subscription from customers.What are all the major functionalities u will test in that case?
How to test and to get the difference between two images which is in the same window?
List out the roles of quality assurance engineer?
What are the actual QA processes run in software compamy ?
Do you have a favourite QA book? More than one? Which ones? And why.
What is the difference between Test cases document and test cases design document?
Explain what is test metric is software testing and what information does it contains?
Plz post any critical bugs found while testing desktop application.
What is traceability matrix? Is it required for every project?
How is adhoc testing different from exploratory testing?
Dear All, Is MBA Graduates Eligible for Software Testing jobs? Thanks Ramesh
kindly guide me about inspection process with the requried roles in detail?
What are the advantage and disadvantages of automated testing?
What if the software is so buggy it ca not really be tested at all?
Kindly tell me some good websites from where I can study about sqa and testing(advance and new material)