Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is A check, B check, C Check & D check for a diesel
Generator? Please guide me as this question was asked many
times and till now i haven't get right answer.If you can mail
me then please mail me the answer @ yogiagarwal@gmail.com.

Answer Posted / hanumanthappa.j kolenahalli

A-Check (Daily routein Check)

1. Check oil level.
2. Check cleanliness of DG
3. Check Battery Voltage
4. Check any Leakage
5. Check all filter condition
6. Check oil Level
7. Check coolent Level
8. Check Check V-Belt condition


B-Check (Every 300- 350 Hrs.)

1. Change oil.
2. Change oil filter,fuel filter,bypass filter.
3. Change Air Filter.
4. Change water Separator
5. Radiator cleaning with chamical

C-Check (Every 800-1500 Hrs.)
1. Change oil.
2. Change oil filter,fuel filter,bypass filter.
3. Change Air Filter.
4. Change water Separator
5. Radiator cleaning with chamical
6. Check All Electrical terminal & thimbles
7. Check polution level


D-check (Every 3000- 5000 Hrs.)

1. Complete DG set should be dismental.
2. Turbo charger service
3. Injector Pin service
4. Cylinder Head service
5. PT Pump sevice &
6. Repeat same B-Check process.

If your DG set running hours more than 10,000 then in D-
Check You should need to be
1. Change Piston Bearing,
2. Change nozels,
3. Piston Cylinder also need to be change.
4. Change Canopy filter if require
5. Check polution level

Is This Answer Correct ?    2 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is the purpose of air cooler of D/E?

2121


How will you classify sliding contact?

1097


what is cswip?

8953


What is the difference between an electric motor and an electric generator?

1263


What are the different types of fits? Explain

1116


What is wet corrosion and galvanic corrosion?

1148


2. Dry saturated steam at 3.5 bar is expanded through a convergent nozzle to 2.2 bar. The exit area is 5 sq. cm. Calculate the exit velocity and mass flow rate, assuming isentropic expansion and super saturated flow. b) A cast iron cylinder head is fastened to a cylinder of 750mm bore with 12 stud bolts. The maximum pressure inside the cylinder is 3 Mpa. The stiffness of part is thrice the stiffness of the bolt. What should be the initial tightening load so that the point is leak proof at maximum pressure? Also choose a suitable bolt for the above application 2 The propeller shaft of a marine engine is to transmit 600 kW at 1200 rpm, without a significant bending. The efficiency of the propeller is 88% at 32 knots ( 1 knot = 1085 km/hr). If the slenderness ratio is less than 50 and the permissible shear stress should not exceed 65 Mpa. Determine the diameter of shaft. 3 A semi-elliptic leaf spring consists of two extra full-length leaves and six graduated length leaves, including the master leaf. Each leaf is 7.2 mm thick and 65 mm wide. The centre-to-centre distance between the two eyes is 1.3m. The leaves are pre-stressed in such a way that when the load is maximum, stress induced in all leaves are equal to 380 N/mm sq. Determine the maximum force that the spring can withstand

2254


State fresh water generation plant made water flow.

1659


why conservator contains 8% total oil qty in transformer any formula to calculate

2225


How much fuel is to be burn for production of 1 ton steam?

1967


Explain how can you convert air mass to air volume?

1106


What are your significant functional achievements in the present company? How did they contribute to the total process

4323


What are the advantages of white metal?

2123


how the magnetic trains are leviated(MAGLEV)?

2073


What is raito of coolent level in DG

2209