1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"
Answer Posted / sulaiman
volume of 1 brick = 0.2286*0.1143*0.0762= 0.00199103 cum
consider 1" thick mortar on either sides
volume of 1 brick with mortar = 0.2413*0.127*0.0889= 0.00272435 cum
No of brick work for 1 cum with mortar = 1/0.00272435 = 367 bricks
No of bricks without mortar for 1 cum= 1/0.00199103 =503 bricks
volume of mortar = (0.00272435-0.00199103)*367= 0.269 cum
volume of mortar in dry condition= 0.269*1.33= 0.358 cum
Cement required= 0.358*1/7*1440= 73.64 kg= 1.473 bags
sand required= 0.358*6/7*35.3357= 10.84 cuft
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
How do you measure water flowing through 300mm diameter pipes?
How do we calculate absolute pressure?
how to do cementicious paint for rcc walls of cw pump house
The 4 main factors to start a construction project are––
How do you prepare Material Recovery Statement for deduction from contractors bills?
what is the weight of 12mm aggregates?
I want to know the material required per square foot in rcc roof. i.e. steel: kg/foot, cement/foot etc.
2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32
how to shuttering is used in slab
Define What is the tallest man made structure in the world?
how much required strength of cement concrete bricks(size 230x115x75mm)
Which are the top apps for you civil engineering?
The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?
What is the difference between Grade I, II and III of GSB?
Trapezoidal section footing calculation of Volume & its Area