Answer Posted / liaindriani
drag and drop in capacity graphic or using planning table
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
define variable cost
What do we do in the realization phase?
In sap-pp what are the costing parameters?
Where we have to specify the teardown time in one operation?
How did you configure the payscale structure?
Describe the process for creating and adding to material BOMs. Include release procedure/status, notifications, responsibilities, authorizations, involved systems, Engineering Change Management, and so on.
What is scope of planning?
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
What is detail scheduling
What is process keys
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
We want to report on several status combinations like each order that has the status ‘not deleted’ and ‘not technically completed’. What set up is required?
Is it possible to convert a 'multiple bom' into a 'variant bom'?
What is the planning horizon?
What is time phased Planning?