how much % of steel use in footing, slab, column
Answer Posted / patel uvais
As per IS 800 mini. Steel for,
SLAB- 0.12%
COLUMN- 0.8%
BEAM - 0.6%
| Is This Answer Correct ? | 7 Yes | 11 No |
Post New Answer View All Answers
Calculation of Pier Cap with tapper area?
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
CAN WORK WELL UNDER DEAD LINES OR PRESSURE?
Explain major differences between routing maintenance and major maintenance.
Define What is passive earth pressure ?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
In the different classes or grades of concrete, what is the difference between C20, M20 B20. what are the letters C, M, and B stands for.
Advantage of Aluminum form work in terms of activities can be skip and cost too
define the strength
What is braced excavation all about?
The concrete slump recommended for beams and slabs; is?
How is calculate the cube molt
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
What in bending moment, if a moment is free end of cantilever beam?
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.