How to decide the Lap Length in Steel
Reinforcement
Answer Posted / bunty sharma
Developing length generally depends on the grade of concrete and grade of reinforcement.And it is decided by the given formula on the basis of IS code;456 :2000
Ld=0.87fyd/4tbd
Is This Answer Correct ? | 19 Yes | 2 No |
Post New Answer View All Answers
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
what is conrete grade ,how are depent on concrete grad and size of concrete?
kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com
Explain what is alternate bid?
how to convert cement, sand aggregate quantity from M3 to kg with full description?
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
What glue is least sticky?
What is the sugested procedure of water purification for public supply?
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
what are the challenges of being a team leader and a supervisor?
What is the exception critarea of cube?
What is meaning of FREE STANDING STAIRCASE ?
What is progress payment?
when reinforcement binding completed if there is more cover than the required what is the solution to reduce the cover?
why the cracks occurs in NP3 class Hume Pipe ? And what is bearing capacity of it?