my 1st friend gave me 1000 and 2nd gave me 500 i have loos
1000 rupees then i purchase some thing with the cost of 300
and gave 100 100 both friends 1st friend remaining 900 and
2nd remaining 400 900+400+300=1600 why
Answer Posted / jagdish
Its 900+400+200=1500
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
Sir, I apply sbi clerk exams(07/09/09)But I did a mistake to enter my date of birth(correct 04.01.1985 / wrong 04.01.1984).please give me suggestions please. Thanking you, Bhushan.B
I-series. When I use: qtp DICTIONARY(PDMZZ) AUTO (*LIBL/MFR0120X)I get the error: *E* Can't open the file specified on the AUTO program parameter. File of different type already exists. When I use it auto without *libl ,qtp DICTIONARY(PDMZZ) AUTO (MFR0120X), it works fine
hi can any one tell me.... do we need to use color catridge also in HP Deskjet 630C series printer.... i have kept only black catridge but its not working.......
I am Recording the QTP Script..the Script is below VbWindow("mdiPP").VbWindow("frmPOSOLocking").ActiveX ("SSTab").VbListView("lstPO").SetItemState "272 [10-11]", micChecked. After when when Run then give error property not found.
how to overload main method in java?
Any body can tel me how to display a Frame Link of a page in Another Frame? For Clearance of my dought..... I designed a BSP page with 3 frames as shown below. -------------------------------- | | | Frame 1 | | | -------------------------------- | Frame 2 | Frame 3 | | | | | Link 1 | | | Link 2 | | | Link 3 | | | | | -------------------------------- Now in Frame 1 i displayed one page.. And in Frame 2 i displayed one page with some links. Now when i clicked on any Link in Frame 2 that corresponding Page has to display in Frame 3. In general HTML i know...But in BSP i don't know that much since i am new to this... plz any solutions...thanks a lot.... Regards, Shankar.
Dear HCM Gurus: I am facing a problem in PCR as per decisive about deduction wage type restricted as per Government rules that if an employee payment period is < then 15 days then deduction are not required to made from employee, Nomenclature of PCR is: RTE=TKDIVI RTE/2 RTE?TKSOLL < PPPAR U Unpaid absences duing Payroll Period *ADDWT U THEN RTE=TASOLL RTE-GAAU04 RTE*2 RTE?TKDIVI < ADDWT& Variable Table = ADDWT* OT TABLE > ADDWT* OT TABLE SO aforesaid mentioned PCR is applied so when employee Leaving action has been performed on 01.10.2010 and rentry into company is performed on dated 11.10.2010 So sytem is not displaying deduction wage type in LPC but if we perform leaving action on 16.10.2010 then all deduction displayed proportionately because from 01.10.2010 to 16th payment days fullfills but client is insisted that employee leaved company on 01.10.2010 and rejoin company on 11.10.2010 and by this way he worked 21 days in this month thus payment period is not less rather more than 15 days and system should have made deductions. Kindly guide me that how included PCR with Rejoining into comapny so pleases explain nomencalture of PCR if an employee rejoin the company and his payment period fullfill requirement. Kindly help Regards Barket Ali Zafar SAP HR Consultant Siemens Engineering Co Ltd PIFRA Project ,Islamabad +92-300-5521524
I want singal maintainer(iii& ii) solved question paper in every year in every board in rrb. If you collect these and sent these my mail-id i shall very grateful to you.
according to class7 how can we give description on pendrive?
I worked with $message and $$message, Bt its not working?..
What is the difference between return code and completion code. When i was searching in the direct for the problem, the following errors displayed. Please can any1 explain these. Completion Code => 4 Message Id => XXDR012I Short Text => XDR field overflow. Key=SER. Len=8. Completion Code => 8 Message Id => XSQF009I Short Text => Sys call open() failed.Filename=/opt/apps/cdt3/USA/outbound/CD810O.errno=17. Completion Code => 8 Message Id => XCPR010I Short Text => Open failed for copy in OPEN_DEST_DATA. Errno=17. can you explain those 3 completion codes and also with difference between return code and completion code
The employee runs big client-server applications and must quickly transfer large files. The company wants the best cost/benefit on this connection. What would be the most practical solution?
hai i got one error i,e http status 404 error what is ds why ds is comming
For pH-4 calculation it is subtracted from the previous pH7 buffer value is the same procedure to be followed for calculation of remaining buffers??
WHAT IS A VECTOR ? HOW IS DIFFER FORM AN ARRAY