how to calculate the volume of water in the water tank
(5'x5'x5')? what"s the formula?

Answer Posted / l.balaji

V=3546 liters
litres per cm:354.6

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

insted of bentonite we can use any alternate material in piling ?

1702


How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?

4500


What is the name of this multiplication factors ?

1707


how i can calculate the actual nos & size of steel to make 1000sqft. x 3"thick slab

2007


what"s the sort of beams?

1815






how to take concrete quantity for precast segment for viaduct project?

2576


What happens to Load at yielding ?

909


while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.

1205


flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force

1496


how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing

1826


What is the strength of 1:6:12 mix?

2595


What is an ice dam sock?

703


16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.

17750


how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.

10582


How to calculate Volume of Wet cement concrete for a specific grade?

1772