how to find the carpenter work per day? how many cubic feet
they should be work per day?
Answer Posted / md.sami
door,window work comes under furniture carpenter, if you ask wooden carpenter no will get you
Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Can we use concrete of slump cone in cube casting in which we have already measured slump?
What is progress payment?
use ofr concrete as per grade ?
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
What are the main reasons for conducting pull-out tests for soil nails?
what is the 0 value in quantity surveying
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
Formula for calculating the volume of bulb in underreamed pile
Who designed the city of washington dc?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
How to calculate the cement consumption in RR Masonry in CM 1:8 for the foundation of Ground Level Reservoir
How to find out slope footing concrete
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
how we can find sieve #4 is 4.75mm?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing