i want to know the easy way to find the quantity of steel
in a slab , coloumn
Answer Posted / hassan bin mohsin
Slab=80 to 90kg m3 for Rcc
Beam=120 to 140kg m3
Column =160 to 180 kg m3
15% increase in lapping, developing length or L brand & wastage etc
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
what is the tensile strength of 10swg and 8swg gabion wire?
How do you calculate reinforcement weight of steel?
What is proportion of PCC Grade G?
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
how i can tak Quantity of mortar in block work
how to calculate the density for high density concrete ? or is it same as the density of RC?
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever
how i convert mm into standard wire guage (SWG)no.
Define absolute co-ordinates?