Answer Posted / krishna
stalling is the condition in which synch. machines lost synchronism and after a time they start to collapse and shutting down...
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
write circuit diagram for a motor rotate in forward direction once it started and when pressed the same button it should rotate in anticlockwise.
Instrument connected to a single phase supply
I'm generating a pulse of 3V with frequency 80Hz (12.5ms time period) and pulse duration 0.125ms and feeding it to a transformer since i want the pulse to get amplified around 60V. At the output amplification s happening but the pulse is changed to a spike, can you tell me what could be the reason? (an ordinary transformer 220V-12V stepdown transformer is reverse connected ie. now it is 12V-220V stepup and voltage amplification happens)
What is the difference between rulling span and wind span of of an Over Head Transmission Line?
What is the difference between DOL starter and star delta starter
How to select HT/MV cable size ?
apti mainly on logical reasoning, verbal and non-verbal ability (70 percent) and remaining technical. I was in ee but technical had mech ques like on turbines and welding.
What are the types of the glands and difference between single and double compression type of cable Glands.
why actual valve timing diagram is different than ideal valve timing digram of a 4 stroke engine?
How many gap between finger contact in a.c.b. and v.cb.?
Whether amorphous core transformer is commercialized or not:Name of company making amorphous core transformer and what are different rating?
how to store the thunder power?
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
Name the component u would expect to find in a switchgear assembly?
Define stepper motor. What is the use of stepper motor?