Difference between P.C.C and R.C.C?
Answer Posted / anuj
PCC is plan cement concrete this concrete use for level cors in bottom of any structure on starting stage on top of earth.
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What are new methods /technologies of pothole patching?
what is the meaning of degreasing of the euipment or line.
what is polity
How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
i have applied 40mm spacer in the concrete for tie beam. is it correct? kindly give me if there any code available
Slab quantity
What is the purpose of Chipping in the heavy foundation?
In csae of hume pipes NP stands for Non Pressure bur what does it really mean?
What is the exception critarea of cube?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
What is rolling stock
Which tests are performed on soil to decide the type of foundation to be provided.
hi guys what happens if you are absent for a supplymentry exam?
whats is difference between anchorage length and development length