Dams are brodely classified into two types: rigid dams and non-rigid dams.
Rigid dams:- these dams construction materials,such as stone or R.C.C or P.C.C. 1.solid gravity dams 2.Aech dams 3.Butrer dams 4.Timer and steel dams.
Non-rigid dams:- these dams have a trapezoidal basic profile.Earth dams and rock fill dams.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the withdrawal force of steel nails?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
Explain what are the skills required to become an architect?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
what is the basic difference between Coloumn & Shear Wall
How to make tiles floor step by step procedure?
Cut Linten (RCC-1:2:4)on 10" wall - what should be the width and hight of cut Linten? Secondly, 1 X 1.6 foot,4" thick window sun/rain shed (Chajja)should consume steel,Cement, sand and Stone chips?
What are your future hopes for this job?
What is the strength of 1:6:12 mix?
Why is concrete cube test carried out?
what is the effect of duration of earth quake on framed structures ?
in one SQM plaster how much Cement and sand consumed in ratio 1:4
foundation details for 25 ton weight Furnace on 2 supports and 2 tilters